| Type | work | bureau |
|---|
| Year / years | 2014 | 1932 |
|---|
| Place | Toronto, Ontario, Canada | Rio de Janeiro, Rio de Janeiro, Brazil |
|---|
| Place context | Toronto, Ontario, Canada | Representative site: Rio de Janeiro, Rio de Janeiro, Brazil |
|---|
| Climate | 3°C · 13.7h daylight · 14 km/h wind | 28°C · 11.5h daylight · 9 km/h wind · via Flamengo Park |
|---|
| Focus | Museum | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works |
|---|
| Typologies | - museum
- cultural building
- art museum
| |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette. | landscape gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|