| Type | work | bureau |
|---|
| Year / years | 1990 | 1901 |
|---|
| Place | Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany | Zurich, Zurich, Switzerland |
|---|
| Place context | Friedrich-Ebert-Anlage, Westend Süd, Frankfurt am Main, Hessen, Deutschland | Representative site: Salginatobelbrücke, Fajauna, Graubünden/Grischun/Grigioni, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 17°C · 13.5h daylight · 2 km/h wind | 11°C · 13.4h daylight · 6 km/h wind · via Salginatobel Bridge |
|---|
| Focus | Architecture | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Salginatobel Bridge
- Schwandbach Bridge
|
|---|
| Typologies | | |
|---|
| Materials | Not recorded yet. | |
|---|
| Carbon signals | tower gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Access not recorded | Access not recorded across linked works |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|