| Type | work | bureau |
|---|
| Year / years | 1954 | 1901 |
|---|
| Place | Neuilly-sur-Seine, Neuilly-sur-Seine, France | Zurich, Zurich, Switzerland |
|---|
| Place context | Neuilly-sur-Seine, Neuilly-sur-Seine, France | Representative site: Schiers, Schiers, Switzerland |
|---|
| Climate | 7°C · 14.0h daylight · 7 km/h wind | 7°C · 13.9h daylight · 3 km/h wind · via Salginatobel Bridge |
|---|
| Focus | House | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Salginatobel Bridge
- Schwandbach Bridge
|
|---|
| Typologies | | |
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Brick look like the main embodied-carbon drivers in the current palette. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Access not recorded | Access not recorded across linked works |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|