| Type | work | bureau |
|---|
| Year / years | 1969 | 1901 |
|---|
| Place | Columbus, Columbus, United States | Zurich, Zurich, Switzerland |
|---|
| Place context | 5th Street, Columbus, Indiana, United States | Representative site: Salginatobelbrücke, Fajauna, Graubünden/Grischun/Grigioni, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 15°C · 13.1h daylight · 11 km/h wind | 9°C · 13.4h daylight · 5 km/h wind · via Salginatobel Bridge |
|---|
| Focus | Sacred building | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Salginatobel Bridge
- Schwandbach Bridge
|
|---|
| Typologies | - library
- church
- sacred space
- memorial
| |
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Brick look like the main embodied-carbon drivers in the current palette. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Publicly accessible | Access not recorded across linked works |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|