saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Opéra de Lyon in Lyon, France
Opéra de Lyon

1831 · Lyon, Lyon, France

Opéra de Lyon image

Opera in Lyon, France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Opéra de Lyon

Lyon, Lyon, France · Exact work coordinates

OpenStreetMap
Field
Opéra de LyonOpéra de Lyon

1831 · Lyon, Lyon, France

Richard Meier & Partners ArchitectsRichard Meier & Partners Architects

1963 · New York, New York, United States

Typeworkbureau
Year / years18311963
PlaceLyon, Lyon, FranceNew York, New York, United States
Place contextLyon, Lyon, FranceRepresentative site: Frankfurt-Süd, Frankfurt-Süd, Germany
Climate11°C · 13.8h daylight · 7 km/h wind9°C · 14.1h daylight · 9 km/h wind · via Museum Angewandte Kunst
FocusHouse21 works in corpus
Architects
  • Jean Nouvel
  • Richard Meier
Linked context

Bureaus

  • Ateliers Jean Nouvel

Notable works

  • Museum Angewandte Kunst
  • Des Moines Art Center
  • Frederick J. Smith House
  • J. Paul Getty Museum
Typologies
  • house
  • performance venue
  • museum
  • house
  • campus building
  • performance venue
  • temple
  • sacred space
  • civic building
  • landscape
Materials

Not recorded yet.

  • adobe
  • glass
  • stone
Carbon signals

house and performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Adobe, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Adobe
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Use classification and product-level EPD research to place this material more precisely.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible11 of 11 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.