| Type | work | bureau |
|---|
| Year / years | Unknown | 1910-1964 |
|---|
| Place | Basel, Basel, Switzerland | Lima, Lima Province, Peru |
|---|
| Place context | Steinenberg, Altstadt Grossbasel, Basel, Basel-Stadt, Schweiz/Suisse/Svizzera/Svizra | Representative site: Avenida Nicolás de Piérola, Urbanización Cercado de Lima, Lima, Lima, Perú |
|---|
| Climate | 12°C · 13.6h daylight · 2 km/h wind | 23°C · 11.8h daylight · 12 km/h wind · via Gran Hotel Bolivar |
|---|
| Focus | Architecture | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works |
|---|
| Typologies | | - hotel
- historic building
- urban landmark
|
|---|
| Materials | Not recorded yet. | - masonry
- concrete
- ornamental stone
|
|---|
| Carbon signals | building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Brick, and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Access not recorded | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|