saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Saint-Pierre, Firminy in Firminy, France
Saint-Pierre, Firminy

2006 · Firminy, Firminy, France

Saint-Pierre, Firminy image

Building by Le Corbusier in France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Saint-Pierre, Firminy

Firminy, Firminy, France · Exact work coordinates

OpenStreetMap
Field
Saint-Pierre, FirminySaint-Pierre, Firminy

2006 · Firminy, Firminy, France

Piet BlomPiet Blom

1960 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years20061960
PlaceFirminy, Firminy, FranceAmsterdam, North Holland, Netherlands
Place contextFirminy, Firminy, FranceRepresentative site: Groningen, Groningen, Netherlands
Climate18°C · 13.8h daylight · 12 km/h wind8°C · 14.3h daylight · 14 km/h wind · via Academie Minerva
FocusArchitecture4 works in corpus
Architects
  • Le Corbusier
  • Piet Blom
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Academie Minerva
  • Cube houses
  • Cube house
  • Theater 't Speelhuis
Typologies
  • building
  • building
  • housing
  • residential
  • urban experiment
  • dabas
  • houses
  • 3d modeling
  • performance venue
Materials
  • concrete
  • concrete
  • timber
Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.