saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Piet Hein Tunnel in Amsterdam, Netherlands
Piet Hein Tunnel

1990 · Amsterdam, Amsterdam, Netherlands

Piet Hein Tunnel image

Image associated with Piet Hein Tunnel.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Piet Hein Tunnel

Amsterdam, Amsterdam, Netherlands · Exact work coordinates

OpenStreetMap
Field
Piet Hein TunnelPiet Hein Tunnel

1990 · Amsterdam, Amsterdam, Netherlands

Piet BlomPiet Blom

1960 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years19901960
PlaceAmsterdam, Amsterdam, NetherlandsAmsterdam, North Holland, Netherlands
Place contextAmsterdam, Amsterdam, NetherlandsRepresentative site: Groningen, Groningen, Netherlands
Climate7°C · 14.3h daylight · 12 km/h wind8°C · 14.3h daylight · 11 km/h wind · via Academie Minerva
FocusArchitecture4 works in corpus
Architects
  • Ben van Berkel
  • Piet Blom
Linked context

Bureaus

  • UNStudio

Notable works

  • Academie Minerva
  • Cube houses
  • Cube house
  • Theater 't Speelhuis
Typologies
  • building
  • building
  • housing
  • residential
  • urban experiment
  • dabas
  • houses
  • 3d modeling
  • performance venue
Materials

Not recorded yet.

  • concrete
  • timber
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.