saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Messeturm in Frankfurt-Innenstadt II, Germany
Messeturm

1990 · Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany

Messeturm image

Skyscraper in Frankfurt, Germany

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Messeturm

Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany · Exact work coordinates

OpenStreetMap
Field
MesseturmMesseturm

1990 · Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany

Piet BlomPiet Blom

1960 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years19901960
PlaceFrankfurt-Innenstadt II, Frankfurt-Innenstadt II, GermanyAmsterdam, North Holland, Netherlands
Place contextFrankfurt-Innenstadt II, Frankfurt-Innenstadt II, GermanyRepresentative site: Groningen, Groningen, Netherlands
Climate13°C · 14.1h daylight · 8 km/h wind8°C · 14.3h daylight · 15 km/h wind · via Academie Minerva
FocusArchitecture4 works in corpus
Architects
  • Helmut Jahn
  • Piet Blom
Linked context

Bureaus

  • Murphy/Jahn

Notable works

  • Academie Minerva
  • Cube houses
  • Cube house
  • Theater 't Speelhuis
Typologies
  • tower
  • building
  • housing
  • residential
  • urban experiment
  • dabas
  • houses
  • 3d modeling
  • performance venue
Materials

Not recorded yet.

  • concrete
  • timber
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.