saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Institut du monde arabe in 5th arrondissement of Paris, France
Institut du Monde Arabe

1987 · Paris, Ile-de-France, France

Institut du monde arabe image

Cultural organization

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Institut du Monde Arabe

Paris, Ile-de-France, France · City-level coordinates only

OpenStreetMap
Field
Institut du Monde Arabe

1987 · Paris, Ile-de-France, France

Piet BlomPiet Blom

1960 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years19871960
PlaceParis, Ile-de-France, FranceAmsterdam, North Holland, Netherlands
Place contextParis, Ile-de-France, FranceRepresentative site: Groningen, Groningen, Netherlands
Climate9°C · 14.1h daylight · 14 km/h wind9°C · 14.5h daylight · 8 km/h wind · via Academie Minerva
FocusCultural institute4 works in corpus
Architects
  • Jean Nouvel
  • Piet Blom
Linked context

Bureaus

  • Ateliers Jean Nouvel

Notable works

  • Academie Minerva
  • Cube houses
  • Cube house
  • Theater 't Speelhuis
Typologies
  • cultural center
  • institutional building
  • museum
  • building
  • housing
  • residential
  • urban experiment
  • dabas
  • houses
  • 3d modeling
  • performance venue
Materials
  • glass
  • steel
  • aluminum
  • concrete
  • timber
Carbon signals

Aluminum, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Aluminum
  • Steel
  • Glass

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Focus on recycled content, lighter assemblies, and careful facade-specification choices.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.