| Type | work | bureau |
|---|
| Year / years | Unknown | 1960 |
|---|
| Place | Hietzing, Hietzing, Austria | Amsterdam, North Holland, Netherlands |
|---|
| Place context | Kennedybrücke, KG Schönbrunn, Wien, Österreich | Representative site: Gedempte Zuiderdiep, Centrum, Binnenstad-zuid, Groningen, Groningen, Nederland |
|---|
| Climate | 15°C · 13.6h daylight · 18 km/h wind | 14°C · 13.9h daylight · 12 km/h wind · via Academie Minerva |
|---|
| Focus | Architecture | 4 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Academie Minerva
- Cube houses
- Cube house
- Theater 't Speelhuis
|
|---|
| Typologies | | - building
- housing
- residential
- urban experiment
- house
- performance venue
|
|---|
| Materials | Not recorded yet. | |
|---|
| Carbon signals | building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
|
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|