saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Stadion Poljud in Split, Croatia
Stadion Poljud

1979 · Split, Split-Dalmatia County, Croatia

Stadion Poljud image

Seed wave 61 image for Stadion Poljud.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Stadion Poljud

Split, Split-Dalmatia County, Croatia · Exact work coordinates

OpenStreetMap
Field
Stadion PoljudStadion Poljud

1979 · Split, Split-Dalmatia County, Croatia

Pier Luigi NerviPier Luigi Nervi

1932 · Rome, Lazio, Italy

Typeworkbureau
Year / years19791932
PlaceSplit, Split-Dalmatia County, CroatiaRome, Lazio, Italy
Place contextSplit, Split-Dalmatia County, CroatiaRepresentative site: Turin, Turin, Italy
Climate19°C · 13.7h daylight · 8 km/h wind23°C · 13.8h daylight · 2 km/h wind · via Torino Esposizioni
FocusStadium5 works in corpus
Architects
  • Boris Magas
  • Pier Luigi Nervi
Linked context

Bureaus

  • Boris Magas

Notable works

  • Torino Esposizioni
  • Cathedral of Saint Mary of the Assumption (San Francisco)
  • Norfolk Scope
  • Paul VI Audience Hall
Typologies
  • stadium
  • sports architecture
  • civic infrastructure
  • building
  • church
  • sacred space
  • cathedral
  • education
  • campus building
  • performance venue
  • landscape
Materials
  • concrete
  • steel
  • concrete
Carbon signals

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.