saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Itatiaia Building in Campinas, Brazil
Itatiaia Building

1957 · Campinas, Campinas, Brazil

Itatiaia Building image

Building in São Paulo, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Itatiaia Building

Campinas, Campinas, Brazil · Exact work coordinates

OpenStreetMap
Field
Itatiaia BuildingItatiaia Building

1957 · Campinas, Campinas, Brazil

Philip JohnsonPhilip Johnson

1949 · New York, New York, United States

Typeworkbureau
Year / years19571949
PlaceCampinas, Campinas, BrazilNew York, New York, United States
Place contextCampinas, Campinas, BrazilRepresentative site: Boston, Boston, United States
Climate21°C · 11.5h daylight · 8 km/h wind7°C · 13.6h daylight · 10 km/h wind · via Boston Central Library
FocusHousing42 works in corpus
Architects
  • Oscar Niemeyer
  • Philip Johnson
Linked context

Bureaus

  • Oscar Niemeyer

Notable works

  • Boston Central Library
  • Munson-Williams-Proctor Arts Institute
  • Glass House (New Canaan, Connecticut)
  • Rockefeller Guest House
Typologies
  • housing
  • tower
  • library
  • museum
  • education
  • house
  • landscape
  • performance venue
  • gallery
  • campus building
Materials

Not recorded yet.

  • glass
  • brick
  • steel
  • concrete
Carbon signals

housing and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Brick
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded21 of 21 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.