saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Firminy Vert in Firminy, France
Firminy Vert

Unknown · Firminy, Firminy, France

Firminy Vert image

Image associated with Firminy Vert.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Firminy Vert

Firminy, Firminy, France · Exact work coordinates

OpenStreetMap
Field
Firminy VertFirminy Vert

Unknown · Firminy, Firminy, France

Philip JohnsonPhilip Johnson

1949 · New York, New York, United States

Typeworkbureau
Year / yearsUnknown1949
PlaceFirminy, Firminy, FranceNew York, New York, United States
Place contextFirminy, Firminy, FranceRepresentative site: Boston, Boston, United States
ClimateClimate unavailableClimate unavailable · via Boston Central Library
FocusSacred building42 works in corpus
Architects
  • Le Corbusier
  • Philip Johnson
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Boston Central Library
  • Munson-Williams-Proctor Arts Institute
  • Glass House (New Canaan, Connecticut)
  • Rockefeller Guest House
Typologies
  • church
  • sacred space
  • sports venue
  • library
  • museum
  • education
  • house
  • landscape
  • performance venue
  • gallery
  • campus building
Materials

Not recorded yet.

  • glass
  • brick
  • steel
  • concrete
Carbon signals

church, sacred space, and sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Brick
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible21 of 21 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.