saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Torre Latinoamericana in Cuauhtémoc, Mexico
Torre Latinoamericana

1956 · Cuauhtémoc, Cuauhtémoc, Mexico

Torre Latinoamericana image

Office in Cuauhtémoc, Mexico City

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Torre Latinoamericana

Cuauhtémoc, Cuauhtémoc, Mexico · Exact work coordinates

OpenStreetMap
Field
Torre LatinoamericanaTorre Latinoamericana

1956 · Cuauhtémoc, Cuauhtémoc, Mexico

Peter BehrensPeter Behrens

1903 · Berlin, Berlin, Germany

Typeworkbureau
Year / years19561903
PlaceCuauhtémoc, Cuauhtémoc, MexicoBerlin, Berlin, Germany
Place contextCuauhtémoc, Cuauhtémoc, MexicoRepresentative site: Bezirk Mitte, Bezirk Mitte, Germany
Climate20°C · 12.7h daylight · 5 km/h wind5°C · 14.3h daylight · 11 km/h wind · via AEG turbine factory
FocusArchitecture6 works in corpus
Architects
  • Augusto H. Alvarez
  • Peter Behrens
Linked context

Bureaus

  • Augusto H. Álvarez

Notable works

  • AEG turbine factory
  • Embassy of Germany, Saint Petersburg
  • Bernauer Straße (Berlin U-Bahn)
  • Voltastraße (Berlin U-Bahn)
Typologies
  • building
  • building
  • house
  • office
  • civic building
Materials

Not recorded yet.

  • glass
  • steel
  • stone
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.