saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Saint-Pierre, Firminy in Firminy, France
Saint-Pierre, Firminy

2006 · Firminy, Firminy, France

Saint-Pierre, Firminy image

Building by Le Corbusier in France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Saint-Pierre, Firminy

Firminy, Firminy, France · Exact work coordinates

OpenStreetMap
Field
Saint-Pierre, FirminySaint-Pierre, Firminy

2006 · Firminy, Firminy, France

Peter BehrensPeter Behrens

1903 · Berlin, Berlin, Germany

Typeworkbureau
Year / years20061903
PlaceFirminy, Firminy, FranceBerlin, Berlin, Germany
Place contextFirminy, Firminy, FranceRepresentative site: Bezirk Mitte, Bezirk Mitte, Germany
Climate9°C · 13.8h daylight · 2 km/h wind7°C · 14.3h daylight · 12 km/h wind · via AEG turbine factory
FocusArchitecture6 works in corpus
Architects
  • Le Corbusier
  • Peter Behrens
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • AEG turbine factory
  • Embassy of Germany, Saint Petersburg
  • Bernauer Straße (Berlin U-Bahn)
  • Voltastraße (Berlin U-Bahn)
Typologies
  • building
  • building
  • house
  • office
  • civic building
Materials
  • concrete
  • glass
  • steel
  • stone
Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.