saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Cidade das Artes in Barra da Tijuca, Brazil
Cidade das Artes

2012 · Barra da Tijuca, Barra da Tijuca, Brazil

Cidade das Artes image

Concert hall in Rio de Janeiro, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Cidade das Artes

Barra da Tijuca, Barra da Tijuca, Brazil · Exact work coordinates

OpenStreetMap
Field
Cidade das ArtesCidade das Artes

2012 · Barra da Tijuca, Barra da Tijuca, Brazil

Peter BehrensPeter Behrens

1903 · Berlin, Berlin, Germany

Typeworkbureau
Year / years20121903
PlaceBarra da Tijuca, Barra da Tijuca, BrazilBerlin, Berlin, Germany
Place contextBarra da Tijuca, Barra da Tijuca, BrazilRepresentative site: Bezirk Mitte, Bezirk Mitte, Germany
Climate28°C · 11.5h daylight · 12 km/h wind11°C · 14.3h daylight · 8 km/h wind · via AEG turbine factory
FocusArchitecture6 works in corpus
Architects
  • Christian de Portzamparc
  • Peter Behrens
Linked context

Bureaus

  • Christian de Portzamparc

Notable works

  • AEG turbine factory
  • Embassy of Germany, Saint Petersburg
  • Bernauer Straße (Berlin U-Bahn)
  • Voltastraße (Berlin U-Bahn)
Typologies
  • building
  • building
  • house
  • office
  • civic building
Materials

Not recorded yet.

  • glass
  • steel
  • stone
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.