saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ars Aevi in Sarajevo, Bosnia and Herzegovina
Ars Aevi

1992 · Sarajevo, Sarajevo, Bosnia and Herzegovina

Ars Aevi image

Art Museum in Sarajevo, Bosnia and Herzegovina

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ars Aevi

Sarajevo, Sarajevo, Bosnia and Herzegovina · Exact work coordinates

OpenStreetMap
Field
Ars AeviArs Aevi

1992 · Sarajevo, Sarajevo, Bosnia and Herzegovina

Peter BehrensPeter Behrens

1903 · Berlin, Berlin, Germany

Typeworkbureau
Year / years19921903
PlaceSarajevo, Sarajevo, Bosnia and HerzegovinaBerlin, Berlin, Germany
Place contextSarajevo, Sarajevo, Bosnia and HerzegovinaRepresentative site: Bezirk Mitte, Bezirk Mitte, Germany
Climate15°C · 13.7h daylight · 7 km/h wind11°C · 14.3h daylight · 7 km/h wind · via AEG turbine factory
FocusMuseum6 works in corpus
Architects
  • Renzo Piano
  • Peter Behrens
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • AEG turbine factory
  • Embassy of Germany, Saint Petersburg
  • Bernauer Straße (Berlin U-Bahn)
  • Voltastraße (Berlin U-Bahn)
Typologies
  • museum
  • building
  • house
  • office
  • civic building
Materials

Not recorded yet.

  • glass
  • steel
  • stone
Carbon signals

museum gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.