saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Accenture Tower (Chicago) in Chicago, United States
Accenture Tower (Chicago)

1987 · Chicago, Chicago, United States

Accenture Tower (Chicago) image

Office skyscraper in Chicago, Illinois

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Accenture Tower (Chicago)

Chicago, Chicago, United States · Exact work coordinates

OpenStreetMap
Field
Accenture Tower (Chicago)Accenture Tower (Chicago)

1987 · Chicago, Chicago, United States

Peter BehrensPeter Behrens

1903 · Berlin, Berlin, Germany

Typeworkbureau
Year / years19871903
PlaceChicago, Chicago, United StatesBerlin, Berlin, Germany
Place contextChicago, Chicago, United StatesRepresentative site: Bezirk Mitte, Bezirk Mitte, Germany
Climate11°C · 13.6h daylight · 15 km/h wind14°C · 14.3h daylight · 11 km/h wind · via AEG turbine factory
FocusHouse6 works in corpus
Architects
  • Helmut Jahn
  • Peter Behrens
Linked context

Bureaus

  • Murphy/Jahn

Notable works

  • AEG turbine factory
  • Embassy of Germany, Saint Petersburg
  • Bernauer Straße (Berlin U-Bahn)
  • Voltastraße (Berlin U-Bahn)
Typologies
  • house
  • tower
  • office
  • building
  • house
  • office
  • civic building
Materials

Not recorded yet.

  • glass
  • steel
  • stone
Carbon signals

house, tower, and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.