saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Tour Légende in Puteaux, France
Tour Légende

2001 · Puteaux, Puteaux, France

Tour Légende image

Office in La Défense

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Tour Légende

Puteaux, Puteaux, France · Exact work coordinates

OpenStreetMap
Field
Tour LégendeTour Légende

2001 · Puteaux, Puteaux, France

Pearce Partnership

Harare, Harare, Zimbabwe

Typeworkbureau
Year / years2001Unrecorded
PlacePuteaux, Puteaux, FranceHarare, Harare, Zimbabwe
Place contextRond-Point de la Défense, Quartier Boieldieu, Puteaux, Île-de-France, FranceRepresentative site: Robert Mugabe Road, Braeside, Harare, Harare Province, Zimbabwe
Climate16°C · 14.2h daylight · 14 km/h wind25°C · 11.6h daylight · 17 km/h wind · via Eastgate Centre
FocusOffice building1 works in corpus
Architects
  • I. M. Pei
  • Mick Pearce
Linked context

Bureaus

  • I. M. Pei & Partners

Notable works

  • Eastgate Centre
Typologies
  • office
  • shopping center
  • office building
  • climate infrastructure
Materials

Not recorded yet.

  • concrete
  • brick
  • glass
Carbon signals

office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Brick, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.