| Type | work | bureau |
|---|
| Year / years | 1998 | 1957-2021 |
|---|
| Place | Beirut, Beirut Governorate, Lebanon | Sao Paulo, Sao Paulo, Brazil |
|---|
| Place context | Beirut, Beirut Governorate, Lebanon | Representative site: Sao Paulo, Sao Paulo, Brazil |
|---|
| Climate | 17°C · 13.2h daylight · 13 km/h wind | 26°C · 11.5h daylight · 11 km/h wind · via Pinacoteca do Estado de Sao Paulo |
|---|
| Focus | Nightclub | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Pinacoteca do Estado de Sao Paulo
- Patriarca Square
|
|---|
| Typologies | - nightclub
- entertainment venue
- adaptive reuse
| - museum
- adaptive reuse
- cultural building
- public space
- urban intervention
- civic infrastructure
|
|---|
| Materials | - concrete
- steel
- mirrored surfaces
| |
|---|
| Carbon signals | Concrete, Steel, and Mirrored Surfaces look like the main embodied-carbon drivers in the current palette. - Concrete
- Steel
- Mirrored Surfaces
| Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Use classification and product-level EPD research to place this material more precisely.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Publicly accessible | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|