| Type | work | bureau |
|---|
| Year / years | 1978 | Unrecorded |
|---|
| Place | Norwich, England, United Kingdom | Unrecorded |
|---|
| Place context | Norwich, England, United Kingdom | Representative site: Basel, Basel, Switzerland |
|---|
| Climate | 8°C · 14.3h daylight · 12 km/h wind | 12°C · 13.9h daylight · 7 km/h wind · via Kunstmuseum Basel |
|---|
| Focus | Museum | 5 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Kunstmuseum Basel
- Stuttgart Hauptbahnhof
- MHPArena
- Sachs-Stadion
|
|---|
| Typologies | - museum
- gallery
- university building
| - museum
- building
- sports venue
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Aluminum, Steel, and Glass look like the main embodied-carbon drivers in the current palette. | museum, building, and sports venue gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Focus on recycled content, lighter assemblies, and careful facade-specification choices.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|