| Type | work | bureau |
|---|
| Year / years | 1977 | Unrecorded |
|---|
| Place | Sydney, New South Wales, Australia | Unrecorded |
|---|
| Place context | King Street Cycleway, Sydney, Sydney, New South Wales, Australia | Representative site: St. Alban-Graben, Vorstädte, Basel, Basel-Stadt, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 17°C · 11.3h daylight · 3 km/h wind | 12°C · 13.6h daylight · 4 km/h wind · via Kunstmuseum Basel |
|---|
| Focus | Office building | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus - Harry Seidler & Associates
| Notable works |
|---|
| Typologies | | |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. | museum gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| No levers surfaced yet. |
|---|
| Accessibility | Access not recorded | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|