saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Exterior view of Casa de Vidro in Sao Paulo, showing the glass volume lifted above the wooded site.
Casa de Vidro

1951 · Sao Paulo, Brazil

Casa de Vidro exterior view

Exterior view of Casa de Vidro in Morumbi, Sao Paulo.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Casa de Vidro

Sao Paulo, Brazil · Exact work coordinates

OpenStreetMap
Field
Casa de VidroCasa de Vidro

1951 · Sao Paulo, Brazil

Paul AndreuPaul Andreu

1968 · Paris, Ile-de-France, France

Typeworkbureau
Year / years19511968
PlaceSao Paulo, BrazilParis, Ile-de-France, France
Place contextSao Paulo, BrazilRepresentative site: Nankō-kita, Nankō-kita, Japan
Climate16°C · 11.4h daylight · 3 km/h wind18°C · 13.2h daylight · 10 km/h wind · via Osaka Maritime Museum
FocusHouse4 works in corpus
Architects
  • Lina Bo Bardi
  • Paul Andreu
Linked context

Bureaus

  • Studio Lina Bo Bardi

Notable works

  • Osaka Maritime Museum
  • Guangzhou Gymnasium
  • Oriental Art Center
  • Suzhou Culture and Arts Centre
Typologies
  • residence
  • house
  • museum
  • building
  • performance venue
  • landscape
Materials
  • glass
  • concrete
  • steel

Not recorded yet.

Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

museum, building, performance venue, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.