saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Parc1 in Yeongdeungpo District, South Korea
Parc1

2020 · Yeongdeungpo District, Yeongdeungpo District, South Korea

Parc1 image

Supertall skyscraper in Seoul

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Parc1

Yeongdeungpo District, Yeongdeungpo District, South Korea · Exact work coordinates

OpenStreetMap
Field
Parc1Parc1

2020 · Yeongdeungpo District, Yeongdeungpo District, South Korea

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20201880
PlaceYeongdeungpo District, Yeongdeungpo District, South KoreaVienna, Vienna, Austria
Place contextYeongdeungpo District, Yeongdeungpo District, South KoreaRepresentative site: Döbling, Döbling, Austria
Climate5°C · 13.4h daylight · 2 km/h wind12°C · 13.9h daylight · 10 km/h wind · via Nussdorf weir and lock
FocusArchitecture21 works in corpus
Architects
  • Richard Rogers
  • Otto Wagner
Linked context

Bureaus

  • Rogers Stirk Harbour + Partners

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • building
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials

Not recorded yet.

  • steel
  • tile
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.