saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Makoko Floating School

2013-2016 · Lagos, Lagos, Nigeria

Lagos, Lagos, Nigeria

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

Makoko Floating School

Image 1

Lagos, Lagos, Nigeria

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
Makoko Floating School

2013-2016 · Lagos, Lagos, Nigeria

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years2013-20161880
PlaceLagos, Lagos, NigeriaVienna, Vienna, Austria
Place contextLagos, Lagos, NigeriaRepresentative site: Döbling, Döbling, Austria
ClimateClimate unavailable12°C · 13.9h daylight · 13 km/h wind · via Nussdorf weir and lock
FocusFloating school prototype21 works in corpus
Architects
  • Kunle Adeyemi
  • Otto Wagner
Linked context

Bureaus

  • NLE

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • infrastructure
  • school
  • floating architecture
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • timber
  • bamboo
  • plastic
  • steel
  • tile
Carbon signals

Bamboo and Plastic look like the main embodied-carbon drivers in the current palette.

  • Bamboo
  • Plastic

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPrivate or restricted7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.