saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Interior view of the Church of the Light with the luminous cruciform opening cut into the concrete wall.
Church of the Light

1989 · Ibaraki, Osaka, Japan

Church of the Light interior view

Interior view of the cruciform light opening in the Church of the Light.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Church of the Light

Ibaraki, Osaka, Japan · Exact work coordinates

OpenStreetMap
Field
Church of the LightChurch of the Light

1989 · Ibaraki, Osaka, Japan

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19891880
PlaceIbaraki, Osaka, JapanVienna, Vienna, Austria
Place contextIbaraki, Osaka, JapanRepresentative site: Döbling, Döbling, Austria
Climate13°C · 13.2h daylight · 5 km/h wind15°C · 13.9h daylight · 13 km/h wind · via Nussdorf weir and lock
FocusChurch21 works in corpus
Architects
  • Tadao Ando
  • Otto Wagner
Linked context

Bureaus

  • Tadao Ando Architect & Associates

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • religious building
  • chapel
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • concrete
  • glass
  • steel
  • tile
Carbon signals

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible7 of 7 recorded works are publicly accessible
Related books

No linked books yet.