saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Bait Ur Rouf Mosque in Dhaka, Bangladesh
Bait Ur Rouf Mosque

2012 · Dhaka, Dhaka Division, Bangladesh

Bait Ur Rouf Mosque image

Seed wave 64 image for Bait Ur Rouf Mosque.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Bait Ur Rouf Mosque

Dhaka, Dhaka Division, Bangladesh · Exact work coordinates

OpenStreetMap
Field
Bait Ur Rouf MosqueBait Ur Rouf Mosque

2012 · Dhaka, Dhaka Division, Bangladesh

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20121880
PlaceDhaka, Dhaka Division, BangladeshVienna, Vienna, Austria
Place contextDhaka, Dhaka Division, BangladeshRepresentative site: Döbling, Döbling, Austria
Climate31°C · 12.9h daylight · 12 km/h wind7°C · 14.1h daylight · 10 km/h wind · via Nussdorf weir and lock
FocusMosque21 works in corpus
Architects
  • Marina Tabassum
  • Otto Wagner
Linked context

Bureaus

  • Marina Tabassum Architects

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • mosque
  • religious architecture
  • civic building
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • brick
  • concrete
  • steel
  • tile
Carbon signals

Concrete and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.