saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Azrieli Center

1999 · Tel Aviv, Tel Aviv District, Israel

Tel Aviv, Tel Aviv District, Israel

18°C · 13.1h daylight · 14 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Azrieli Center

Tel Aviv, Tel Aviv District, Israel · City-level coordinates only

OpenStreetMap

Azrieli Center

Image 1

Tel Aviv, Tel Aviv District, Israel

Climate: 18°C · 13.1h daylight · 14 km/h wind

Mapping: City-level coordinates only

Field
Azrieli CenterAzrieli Center

1999 · Tel Aviv, Tel Aviv District, Israel

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19991880
PlaceTel Aviv, Tel Aviv District, IsraelVienna, Vienna, Austria
Place contextTel Aviv, Tel Aviv District, IsraelRepresentative site: Döbling, Döbling, Austria
Climate18°C · 13.1h daylight · 14 km/h wind9°C · 13.9h daylight · 12 km/h wind · via Nussdorf weir and lock
FocusMixed-use towers21 works in corpus
Architects

No architects linked yet.

  • Otto Wagner
Linked context

Bureaus

No linked context yet.

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • mixed-use
  • skyscraper
  • office building
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • glass
  • steel
  • concrete
  • steel
  • tile
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.