saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Astana International Airport Terminal

Astana, Astana, Kazakhstan · Exact work coordinates

OpenStreetMap

Astana International Airport Terminal

Image 1

Astana, Astana, Kazakhstan

Climate: Climate unavailable

Mapping: Exact work coordinates

Field
Astana International Airport TerminalAstana International Airport Terminal

2005 · Astana, Astana, Kazakhstan

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20051880
PlaceAstana, Astana, KazakhstanVienna, Vienna, Austria
Place contextAstana, Astana, KazakhstanRepresentative site: Döbling, Döbling, Austria
ClimateClimate unavailableClimate unavailable · via Nussdorf weir and lock
FocusAirport terminal21 works in corpus
Architects
  • Kisho Kurokawa
  • Otto Wagner
Linked context

Bureaus

  • Kisho Kurokawa Architect & Associates

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • airport
  • terminal
  • transport hub
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • glass
  • steel
  • concrete
  • steel
  • tile
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.