saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Abeno Harukas in Abeno-ku, Japan
Abeno Harukas

1937 · Abeno-ku, Abeno-ku, Japan

Abeno Harukas image

Mixed-use in Osaka, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Abeno Harukas

Abeno-ku, Abeno-ku, Japan · Exact work coordinates

OpenStreetMap
Field
Abeno HarukasAbeno Harukas

1937 · Abeno-ku, Abeno-ku, Japan

Otto WagnerOtto Wagner

1880 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19371880
PlaceAbeno-ku, Abeno-ku, JapanVienna, Vienna, Austria
Place contextAbeno-ku, Abeno-ku, JapanRepresentative site: Döbling, Döbling, Austria
Climate15°C · 13.3h daylight · 4 km/h wind10°C · 14.0h daylight · 16 km/h wind · via Nussdorf weir and lock
FocusArchitecture21 works in corpus
Architects
  • Togo Murano
  • Otto Wagner
Linked context

Bureaus

  • Togo Murano

Notable works

  • Nussdorf weir and lock
  • Pilgramgasse station
  • Kettenbrückengasse station
  • Hotel Bristol, Warsaw
Typologies
  • tower
  • building
  • housing
  • hospitality
  • church
  • sacred space
  • performance venue
  • house
  • civic building
Materials
  • concrete
  • glass
  • steel
  • plaster
  • timber
  • steel
  • tile
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Steel and Tile look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Tile
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.