saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

University of Brasília in Gama, Brazil
University of Brasília

1962 · Gama, Gama, Brazil

University of Brasília image

Public university in Brasília, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

University of Brasília

Gama, Gama, Brazil · Exact work coordinates

OpenStreetMap
Field
University of BrasíliaUniversity of Brasília

1962 · Gama, Gama, Brazil

Oscar NiemeyerOscar Niemeyer

1940 · Rio de Janeiro, Rio de Janeiro, Brazil

Typeworkbureau
Year / years19621940
PlaceGama, Gama, BrazilRio de Janeiro, Rio de Janeiro, Brazil
Place contextGama, Gama, BrazilRepresentative site: Milan, Milan, Italy
Climate21°C · 11.7h daylight · 2 km/h wind15°C · 13.8h daylight · 6 km/h wind · via Mondadori
FocusEducation building58 works in corpus
Architects
  • Oscar Niemeyer
  • Oscar Niemeyer
Linked context

Bureaus

  • Oscar Niemeyer

Notable works

  • Mondadori
  • Grande Hotel of Ouro Preto
  • Casa do Baile
  • Church of Saint Francis of Assisi, Pampulha
Typologies
  • education
  • campus building
  • building
  • hospitality
  • church
  • sacred space
  • chapel
  • landscape
  • performance venue
  • gallery
Materials

Not recorded yet.

  • concrete
  • glass
Carbon signals

education and campus building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded24 of 24 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.