saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Paper Dome in Puli Township, Japan
Paper Dome

2008 · Puli Township, Puli Township, Japan

Paper Dome image

Church in Nantou County, Taiwan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Paper Dome

Puli Township, Puli Township, Japan · Exact work coordinates

OpenStreetMap
Field
Paper DomePaper Dome

2008 · Puli Township, Puli Township, Japan

Oscar NiemeyerOscar Niemeyer

1940 · Rio de Janeiro, Rio de Janeiro, Brazil

Typeworkbureau
Year / years20081940
PlacePuli Township, Puli Township, JapanRio de Janeiro, Rio de Janeiro, Brazil
Place contextPuli Township, Puli Township, JapanRepresentative site: Milan, Milan, Italy
Climate21°C · 12.8h daylight · 3 km/h wind22°C · 13.8h daylight · 8 km/h wind · via Mondadori
FocusSacred building58 works in corpus
Architects
  • Shigeru Ban
  • Oscar Niemeyer
Linked context

Bureaus

  • Shigeru Ban Architects

Notable works

  • Mondadori
  • Grande Hotel of Ouro Preto
  • Casa do Baile
  • Church of Saint Francis of Assisi, Pampulha
Typologies
  • church
  • sacred space
  • building
  • hospitality
  • church
  • sacred space
  • chapel
  • landscape
  • performance venue
  • gallery
Materials

Not recorded yet.

  • concrete
  • glass
Carbon signals

church and sacred space gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible24 of 24 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.