saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Lemke House in Lichtenberg, Germany
Lemke House

1933 · Lichtenberg, Lichtenberg, Germany

Lemke House image

Building by Ludwig Mies van der Rohe

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Lemke House

Lichtenberg, Lichtenberg, Germany · Exact work coordinates

OpenStreetMap
Field
Lemke HouseLemke House

1933 · Lichtenberg, Lichtenberg, Germany

Oscar NiemeyerOscar Niemeyer

1940 · Rio de Janeiro, Rio de Janeiro, Brazil

Typeworkbureau
Year / years19331940
PlaceLichtenberg, Lichtenberg, GermanyRio de Janeiro, Rio de Janeiro, Brazil
Place contextLichtenberg, Lichtenberg, GermanyRepresentative site: Milan, Milan, Italy
Climate7°C · 14.3h daylight · 13 km/h wind18°C · 13.8h daylight · 3 km/h wind · via Mondadori
FocusHouse58 works in corpus
Architects
  • Ludwig Mies van der Rohe
  • Oscar Niemeyer
Linked context

Bureaus

  • Mies van der Rohe

Notable works

  • Mondadori
  • Grande Hotel of Ouro Preto
  • Casa do Baile
  • Church of Saint Francis of Assisi, Pampulha
Typologies
  • house
  • building
  • hospitality
  • church
  • sacred space
  • chapel
  • landscape
  • performance venue
  • gallery
Materials

Not recorded yet.

  • concrete
  • glass
Carbon signals

house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded24 of 24 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.