saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Art Tower Mito in Mito, Japan
Art Tower Mito

1990 · Mito, Mito, Japan

Art Tower Mito image

Art gallery

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Art Tower Mito

Mito, Mito, Japan · Exact work coordinates

OpenStreetMap
Field
Art Tower MitoArt Tower Mito

1990 · Mito, Mito, Japan

Oscar NiemeyerOscar Niemeyer

1940 · Rio de Janeiro, Rio de Janeiro, Brazil

Typeworkbureau
Year / years19901940
PlaceMito, Mito, JapanRio de Janeiro, Rio de Janeiro, Brazil
Place contextMito, Mito, JapanRepresentative site: Milan, Milan, Italy
Climate13°C · 13.3h daylight · 2 km/h wind22°C · 13.8h daylight · 6 km/h wind · via Mondadori
FocusPerformance venue58 works in corpus
Architects
  • Arata Isozaki
  • Oscar Niemeyer
Linked context

Bureaus

  • Arata Isozaki & Associates

Notable works

  • Mondadori
  • Grande Hotel of Ouro Preto
  • Casa do Baile
  • Church of Saint Francis of Assisi, Pampulha
Typologies
  • gallery
  • performance venue
  • tower
  • building
  • hospitality
  • church
  • sacred space
  • chapel
  • landscape
  • performance venue
  • gallery
Materials

Not recorded yet.

  • concrete
  • glass
Carbon signals

gallery, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible24 of 24 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.