saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Tour Landscape

1983 · Puteaux, Puteaux, France

Puteaux, Puteaux, France

14°C · 14.0h daylight · 13 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Tour Landscape

Puteaux, Puteaux, France · Exact work coordinates

OpenStreetMap

Tour Landscape

Image 1

Puteaux, Puteaux, France

Climate: 14°C · 14.0h daylight · 13 km/h wind

Mapping: Exact work coordinates

Field
Tour Landscape

1983 · Puteaux, Puteaux, France

OMAOMA

Doha, Qatar

Typeworkbureau
Year / years1983Unrecorded
PlacePuteaux, Puteaux, FranceDoha, Qatar
Place contextPuteaux, Puteaux, FranceRepresentative site: Rotterdam, Rotterdam, Netherlands
Climate14°C · 14.0h daylight · 13 km/h wind10°C · 14.2h daylight · 12 km/h wind · via Kunsthal
FocusOffice building20 works in corpus
Architects
  • Dominique Perrault
  • Rem Koolhaas
Linked context

Bureaus

  • Dominique Perrault Architecture

Notable works

  • Kunsthal
  • Zénith de Lille
  • De Rotterdam
  • Guggenheim Hermitage Museum
Typologies
  • tower
  • office
  • building
  • tower
  • hospitality
  • office
  • museum
  • performance venue
  • library
  • cultural
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
  • stone
Carbon signals

tower and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded9 of 9 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.