saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Saint-Pierre, Firminy in Firminy, France
Saint-Pierre, Firminy

2006 · Firminy, Firminy, France

Saint-Pierre, Firminy image

Building by Le Corbusier in France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Saint-Pierre, Firminy

Firminy, Firminy, France · Exact work coordinates

OpenStreetMap
Field
Saint-Pierre, FirminySaint-Pierre, Firminy

2006 · Firminy, Firminy, France

OMAOMA

Doha, Qatar

Typeworkbureau
Year / years2006Unrecorded
PlaceFirminy, Firminy, FranceDoha, Qatar
Place contextFirminy, Firminy, FranceRepresentative site: Rotterdam, Rotterdam, Netherlands
Climate18°C · 13.8h daylight · 13 km/h wind13°C · 14.2h daylight · 6 km/h wind · via Kunsthal
FocusArchitecture20 works in corpus
Architects
  • Le Corbusier
  • Rem Koolhaas
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Kunsthal
  • Zénith de Lille
  • De Rotterdam
  • Guggenheim Hermitage Museum
Typologies
  • building
  • building
  • tower
  • hospitality
  • office
  • museum
  • performance venue
  • library
  • cultural
Materials
  • concrete
  • glass
  • steel
  • concrete
  • stone
Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded9 of 9 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.