saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Tour Landscape

1983 · Puteaux, Puteaux, France

Puteaux, Puteaux, France

15°C · 14.0h daylight · 14 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Tour Landscape

Puteaux, Puteaux, France · Exact work coordinates

OpenStreetMap

Tour Landscape

Image 1

Puteaux, Puteaux, France

Climate: 15°C · 14.0h daylight · 14 km/h wind

Mapping: Exact work coordinates

Field
Tour Landscape

1983 · Puteaux, Puteaux, France

Olson Kundig

San Juan Island, San Juan Islands, United States

Typeworkbureau
Year / years1983Unrecorded
PlacePuteaux, Puteaux, FranceSan Juan Island, San Juan Islands, United States
Place contextPuteaux, Puteaux, FranceRepresentative site: San Juan Island, San Juan Islands, United States
Climate15°C · 14.0h daylight · 14 km/h windClimate unavailable · via Rolling Huts
FocusOffice building2 works in corpus
Architects
  • Dominique Perrault
  • Olson Kundig
Linked context

Bureaus

  • Dominique Perrault Architecture

Notable works

  • Rolling Huts
  • The Pierre
Typologies
  • tower
  • office
  • hospitality
  • lodging
  • cabins lodges
  • wood
  • top100
  • residential
  • houses
  • san juan
Materials

Not recorded yet.

  • wood
  • steel
  • concrete
Carbon signals

tower and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.