saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Schloss Tegel in Reinickendorf, Germany
Schloss Tegel

1820 · Reinickendorf, Reinickendorf, Germany

Schloss Tegel image

Country house in Berlin

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Schloss Tegel

Reinickendorf, Reinickendorf, Germany · Exact work coordinates

OpenStreetMap
Field
Schloss TegelSchloss Tegel

1820 · Reinickendorf, Reinickendorf, Germany

Olson Kundig

San Juan Island, San Juan Islands, United States

Typeworkbureau
Year / years1820Unrecorded
PlaceReinickendorf, Reinickendorf, GermanySan Juan Island, San Juan Islands, United States
Place contextReinickendorf, Reinickendorf, GermanyRepresentative site: San Juan Island, San Juan Islands, United States
Climate8°C · 14.3h daylight · 9 km/h windClimate unavailable · via Rolling Huts
FocusHouse2 works in corpus
Architects
  • Karl Friedrich Schinkel
  • Olson Kundig
Linked context

Bureaus

  • Karl Friedrich Schinkel

Notable works

  • Rolling Huts
  • The Pierre
Typologies
  • house
  • hospitality
  • lodging
  • cabins lodges
  • wood
  • top100
  • residential
  • houses
  • san juan
Materials

Not recorded yet.

  • wood
  • steel
  • concrete
Carbon signals

house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.