saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Parc1 in Yeongdeungpo District, South Korea
Parc1

2020 · Yeongdeungpo District, Yeongdeungpo District, South Korea

Parc1 image

Supertall skyscraper in Seoul

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Parc1

Yeongdeungpo District, Yeongdeungpo District, South Korea · Exact work coordinates

OpenStreetMap
Field
Parc1Parc1

2020 · Yeongdeungpo District, Yeongdeungpo District, South Korea

Olson Kundig

San Juan Island, San Juan Islands, United States

Typeworkbureau
Year / years2020Unrecorded
PlaceYeongdeungpo District, Yeongdeungpo District, South KoreaSan Juan Island, San Juan Islands, United States
Place contextYeongdeungpo District, Yeongdeungpo District, South KoreaRepresentative site: San Juan Island, San Juan Islands, United States
Climate10°C · 13.4h daylight · 5 km/h windClimate unavailable · via Rolling Huts
FocusArchitecture2 works in corpus
Architects
  • Richard Rogers
  • Olson Kundig
Linked context

Bureaus

  • Rogers Stirk Harbour + Partners

Notable works

  • Rolling Huts
  • The Pierre
Typologies
  • building
  • hospitality
  • lodging
  • cabins lodges
  • wood
  • top100
  • residential
  • houses
  • san juan
Materials

Not recorded yet.

  • wood
  • steel
  • concrete
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.