saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

LUMA Arles in Arles, France
LUMA Arles

2013 · Arles, Arles, France

LUMA Arles image

Arts centre in Arles, France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

LUMA Arles

Arles, Arles, France · Exact work coordinates

OpenStreetMap
Field
LUMA ArlesLUMA Arles

2013 · Arles, Arles, France

Olson Kundig

San Juan Island, San Juan Islands, United States

Typeworkbureau
Year / years2013Unrecorded
PlaceArles, Arles, FranceSan Juan Island, San Juan Islands, United States
Place contextArles, Arles, FranceRepresentative site: San Juan Island, San Juan Islands, United States
Climate15°C · 13.7h daylight · 13 km/h windClimate unavailable · via Rolling Huts
FocusArchitecture2 works in corpus
Architects
  • Frank Gehry
  • Olson Kundig
Linked context

Bureaus

  • Gehry Partners

Notable works

  • Rolling Huts
  • The Pierre
Typologies
  • tower
  • hospitality
  • lodging
  • cabins lodges
  • wood
  • top100
  • residential
  • houses
  • san juan
Materials
  • steel
  • wood
  • steel
  • concrete
Carbon signals

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.