saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Flamengo Park in Rio de Janeiro, Brazil
Flamengo Park

1965 · Rio de Janeiro, Rio de Janeiro, Brazil

Flamengo Park image

Largest public park in Rio de Janeiro, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Flamengo Park

Rio de Janeiro, Rio de Janeiro, Brazil · Exact work coordinates

OpenStreetMap
Field
Flamengo ParkFlamengo Park

1965 · Rio de Janeiro, Rio de Janeiro, Brazil

Olson Kundig

San Juan Island, San Juan Islands, United States

Typeworkbureau
Year / years1965Unrecorded
PlaceRio de Janeiro, Rio de Janeiro, BrazilSan Juan Island, San Juan Islands, United States
Place contextRio de Janeiro, Rio de Janeiro, BrazilRepresentative site: San Juan Island, San Juan Islands, United States
Climate27°C · 11.4h daylight · 3 km/h windClimate unavailable · via Rolling Huts
FocusLandscape project2 works in corpus
Architects
  • Roberto Burle Marx
  • Olson Kundig
Linked context

Bureaus

  • Roberto Burle Marx

Notable works

  • Rolling Huts
  • The Pierre
Typologies
  • landscape
  • hospitality
  • lodging
  • cabins lodges
  • wood
  • top100
  • residential
  • houses
  • san juan
Materials

Not recorded yet.

  • wood
  • steel
  • concrete
Carbon signals

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessibleAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.