saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

America's Cup Building

Grau, Grau, Spain · Exact work coordinates

OpenStreetMap
Field
America's Cup BuildingAmerica's Cup Building

2006 · Grau, Grau, Spain

MVRDVMVRDV

Seoul, South Korea

Typeworkbureau
Year / years2006Unrecorded
PlaceGrau, Grau, SpainSeoul, South Korea
Place contextGrau, Grau, SpainRepresentative site: Amsterdam, Amsterdam, Netherlands
Climate21°C · 13.5h daylight · 14 km/h wind13°C · 14.3h daylight · 11 km/h wind · via Silodam
FocusArchitecture9 works in corpus
Architects
  • David Chipperfield
  • Winy Maas
Linked context

Bureaus

  • David Chipperfield Architects

Notable works

  • Silodam
  • Effenaar
  • Market Hall (Rotterdam)
  • Westerdok Apartments
Typologies
  • building
  • housing
  • building
  • house
  • office
  • landscape
  • residential
  • apartments
  • dabas
Materials

Not recorded yet.

  • glass
  • concrete
  • other
  • brick
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Brick, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded3 of 3 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.