saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Messeturm in Frankfurt-Innenstadt II, Germany
Messeturm

1990 · Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany

Messeturm image

Skyscraper in Frankfurt, Germany

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Messeturm

Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany · Exact work coordinates

OpenStreetMap
Field
MesseturmMesseturm

1990 · Frankfurt-Innenstadt II, Frankfurt-Innenstadt II, Germany

Murphy/JahnMurphy/Jahn

1973 · Chicago, Illinois, United States

Typeworkbureau
Year / years19901973
PlaceFrankfurt-Innenstadt II, Frankfurt-Innenstadt II, GermanyChicago, Illinois, United States
Place contextFrankfurt-Innenstadt II, Frankfurt-Innenstadt II, GermanyRepresentative site: Chiyoda, Chiyoda, Japan
Climate13°C · 14.1h daylight · 12 km/h wind16°C · 13.3h daylight · 6 km/h wind · via Tokyo Station
FocusArchitecture28 works in corpus
Architects
  • Helmut Jahn
  • Helmut Jahn
Linked context

Bureaus

  • Murphy/Jahn

Notable works

  • Tokyo Station
  • Museum of Contemporary Art San Diego
  • Michigan City Public Library
  • 11 Diagonal Street
Typologies
  • tower
  • building
  • museum
  • library
  • tower
  • office
  • house
  • performance venue
  • hospitality
Materials

Not recorded yet.

  • glass
  • concrete
  • stone
  • steel
  • timber
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.