saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Looshaus in Innere Stadt, Austria
Looshaus

1911 · Innere Stadt, Innere Stadt, Austria

Looshaus image

Multi-use building in Vienna, Austria

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Looshaus

Innere Stadt, Innere Stadt, Austria · Exact work coordinates

OpenStreetMap
Field
LooshausLooshaus

1911 · Innere Stadt, Innere Stadt, Austria

Murphy/JahnMurphy/Jahn

1973 · Chicago, Illinois, United States

Typeworkbureau
Year / years19111973
PlaceInnere Stadt, Innere Stadt, AustriaChicago, Illinois, United States
Place contextHerrengasse, Innere Stadt, Widmerviertel, Wien, ÖsterreichRepresentative site: エレベーター;1階, 丸の内一丁目, 千代田区, 日本
Climate16°C · 13.9h daylight · 14 km/h wind16°C · 13.3h daylight · 6 km/h wind · via Tokyo Station
FocusHousing28 works in corpus
Architects
  • Adolf Loos
  • Helmut Jahn
Linked context

Bureaus

  • Adolf Loos

Notable works

  • Tokyo Station
  • Museum of Contemporary Art San Diego
  • Michigan City Public Library
  • 11 Diagonal Street
Typologies
  • housing
  • building
  • museum
  • library
  • tower
  • office
  • house
  • performance venue
  • hospitality
Materials

Not recorded yet.

  • glass
  • concrete
  • stone
  • steel
  • timber
Carbon signals

housing gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.