| Type | work | bureau |
|---|
| Year / years | 1955 | 1973 |
|---|
| Place | La Plata, Buenos Aires Province, Argentina | Chicago, Illinois, United States |
|---|
| Place context | La Plata, Buenos Aires Province, Argentina | Representative site: Chiyoda, Chiyoda, Japan |
|---|
| Climate | Climate unavailable | Climate unavailable · via Tokyo Station |
|---|
| Focus | House-clinic | 28 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Tokyo Station
- Museum of Contemporary Art San Diego
- Michigan City Public Library
- 11 Diagonal Street
|
|---|
| Typologies | - house
- modernism
- residential building
| - building
- museum
- library
- tower
- office
- house
- performance venue
- hospitality
|
|---|
| Materials | | - glass
- concrete
- stone
- steel
- timber
|
|---|
| Carbon signals | Concrete and Glass look like the main embodied-carbon drivers in the current palette. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Publicly accessible | 7 of 7 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|