saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
King Power Mahanakhon

2016 · Bangkok, Bangkok, Thailand

Bangkok, Bangkok, Thailand

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

King Power Mahanakhon

Image 1

Bangkok, Bangkok, Thailand

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
King Power MahanakhonKing Power Mahanakhon

2016 · Bangkok, Bangkok, Thailand

Mihajlo MitrovicMihajlo Mitrovic

1950-2018 · Belgrade, Belgrade, Serbia

Typeworkbureau
Year / years20161950-2018
PlaceBangkok, Bangkok, ThailandBelgrade, Belgrade, Serbia
Place contextBangkok, Bangkok, ThailandRepresentative site: Kragujevac, Kragujevac, Serbia
ClimateClimate unavailable10°C · 13.7h daylight · 2 km/h wind · via Šumarice Memorial Park
FocusSkyscraper3 works in corpus
Architects

No architects linked yet.

  • Mihajlo Mitrovic
Linked context

Bureaus

No linked context yet.

Notable works

  • Šumarice Memorial Park
  • Western City Gate
  • Church of St. Basil of Ostrog, Belgrade
Typologies
  • skyscraper
  • mixed-use
  • high-rise
  • museum
  • education
  • memorial
  • landscape
  • tower
  • brutalism
  • mixed-use
  • church
Materials
  • glass
  • steel
  • concrete
Carbon signals

Steel and Glass look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.