saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Can Lis in Santanyí, Spain
Can Lis

1971 · Santanyí, Santanyí, Spain

Can Lis image

House in Majorca, Spain

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Can Lis

Santanyí, Santanyí, Spain · Exact work coordinates

OpenStreetMap
Field
Can LisCan Lis

1971 · Santanyí, Santanyí, Spain

MecanooMecanoo

Lisse, Zuid-Holland, The Netherlands

Typeworkbureau
Year / years1971Unrecorded
PlaceSantanyí, Santanyí, SpainLisse, Zuid-Holland, The Netherlands
Place contextSantanyí, Santanyí, SpainRepresentative site: Delft, Delft, Netherlands
Climate16°C · 13.5h daylight · 3 km/h wind10°C · 14.4h daylight · 15 km/h wind · via Delft railway station
FocusHouse10 works in corpus
Architects
  • Jorn Utzon
  • Francine Houben
Linked context

Bureaus

  • Utzon Arkitekter

Notable works

  • Delft railway station
  • TU Delft Library
  • Montevideo (Rotterdam)
  • La Llotja de Lleida / Mecanoo + labb arquitectur
Typologies
  • house
  • civic building
  • office
  • landscape
  • library
  • education
  • campus building
  • housing
  • tower
  • public
Materials

Not recorded yet.

  • stone
  • other
  • wood
  • steel
  • glass
  • concrete
Carbon signals

house and civic building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.