| Type | work | bureau |
|---|
| Year / years | 1925 | Unrecorded |
|---|
| Place | Grenoble, Grenoble, France | Seoul, South Korea |
|---|
| Place context | Grenoble, Grenoble, France | Representative site: Seoul, South Korea |
|---|
| Climate | 11°C · 13.8h daylight · 2 km/h wind | 12°C · 13.4h daylight · 6 km/h wind · via S-Trenue Tower |
|---|
| Focus | Landscape project | 2 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - S-Trenue Tower
- Boutique Monaco
|
|---|
| Typologies | | - mixed use
- offices
- residential
- housing
- tower
- office
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete look like the main embodied-carbon drivers in the current palette. | Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
| - Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Publicly accessible | Access not recorded across linked works |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|