| Type | work | bureau |
|---|
| Year / years | 2016 | 2008 |
|---|
| Place | Bangkok, Bangkok, Thailand | Boston, Massachusetts, United States |
|---|
| Place context | Bangkok, Bangkok, Thailand | Representative site: Butaro, Northern Province, Rwanda |
|---|
| Climate | Climate unavailable | 15°C · 12.1h daylight · 8 km/h wind · via Butaro Hospital |
|---|
| Focus | Skyscraper | 1 works in corpus |
|---|
| Architects | No architects linked yet. | No architects linked yet. |
|---|
| Linked context | Bureaus No linked context yet. | Notable works |
|---|
| Typologies | - skyscraper
- mixed-use
- high-rise
| - hospital
- healthcare
- medical campus
|
|---|
| Materials | | |
|---|
| Carbon signals | Steel and Glass look like the main embodied-carbon drivers in the current palette. | Concrete, Steel, and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|